• We work with global industries!

Providing WSIS to SIPCOT industrial growth centre at Gangaikondan in Tirunelveli District

The project “Providing WSIS to SIPCOT Industrial Growth Centre at Gangaikondan in Tirunelveli District” focuses on establishing a comprehensive Water Supply and Infrastructure System (WSIS) to support the operational needs of industries within the SIPCOT industrial hub. The scope of work includes sourcing water from reliable sources, construction of intake wells or pumping stations, laying of transmission and distribution pipelines, and installation of storage facilities such as overhead tanks and sumps to ensure uninterrupted water supply.

Formation of Earthern reservoir for storing treated Effluent water at Tnpl I Kathithapuram

The project “Formation of Earthen Reservoir for Storing Treated Effluent Water at TNPL Unit–I, Kagithapuram” involves the construction of a specially designed earthen reservoir to safely store treated wastewater generated from industrial processes. The objective of this project is to promote water conservation and reuse by collecting treated effluent water that meets environmental standards, thereby reducing dependency on fresh water sources. The work includes site selection and preparation, excavation, embankment formation using suitable soil, and proper compaction to ensure the stability and strength of the reservoir structure.

Drilling in soil on wall for slope protection works for Mukkola JN to Tamil Nadu /Kerala Border Road project in the state of Kerala.

The project “Drilling in Soil on Wall for Slope Protection Works for Mukkola Junction to Tamil Nadu/Kerala Border Road in the State of Kerala” focuses on stabilizing vulnerable slopes along the roadway to prevent soil erosion, landslides, and structural failures. Due to the hilly terrain and heavy rainfall in this region, slopes adjacent to roads are prone to instability, posing risks to traffic safety and infrastructure. The work involves drilling into soil and existing retaining walls to install reinforcement systems such as soil nails, rock bolts, or anchors, which help bind the soil mass and improve overall slope stability.

Retrofitting for the existing CWSS to 60 Quality Affected Habitations and 59 way side habitations in Kattumannarkoil Union of Cuddalore District under JJM 2021- 22

The project “Retrofitting for the Existing Combined Water Supply Scheme (CWSS) to 60 Quality Affected Habitations and 59 Wayside Habitations in Kattumannarkoil Union of Cuddalore District under JJM 2021–22” focuses on upgrading and strengthening the existing water supply infrastructure to ensure safe and reliable drinking water for all identified habitations. Under the Jal Jeevan Mission (JJM), this work aims to address issues related to poor water quality and inadequate supply by improving the efficiency and capacity of the current system.