Rehabilitation works in sholayar Dam in PAP system in Valparai Taluk Coimbatore District
The rehabilitation works at Sholayar Dam, part of the Parambikulam Aliyar Project (PAP) system in Valparai Taluk of Coimbatore District, involve the restoration and strengthening of the dam and its associated structures to ensure long-term safety, efficiency, and water management. These works typically include repairing damaged concrete surfaces, strengthening the dam body, improving spillways and drainage systems, upgrading mechanical and electrical components, and addressing seepage or structural weaknesses. The project aims to enhance the dam’s capacity to store and regulate water effectively for irrigation, hydroelectric power generation, and drinking water supply, while also ensuring compliance with modern safety standards and extending the lifespan of this critical infrastructure.
